下載手機(jī)汽配人

超前小導(dǎo)管注漿止?jié){方法有哪些?

提問者:網(wǎng)友 2018-08-11
最佳回答
Abstract: Staggered by the length of small pipe leading drilling and grouting support technology, Lion-shaped tunnel Ⅱ rock preinstalled reinforcement, through small pipe hole to loose rock into the cement to the Rock Fracture filling and broken rock glue to form a whole and thus enhance the coherence and rock solid. Thesis describes a small catheter injection process, drilling and grouting equipment, Grouting parameter selection and practical engineering applications. Through the tunnel deformation monitoring and analysis of grouting has achieved very good results. Keywords:Small tube; Tunnel; Surrounding rock reinforcement; Pre-grouting 0Overview With the development of the motorway and railway, an increasing number of tunneling in unstable formations, often with advanced support of the ground pre-reinforcement. Advanced support is generally have the following forms: Advanced large pipe, advanced pre-grouting (comprehensive pre-grouting), ahead of bolt and advance canal, etc.; These consolidation measures,
回答者:網(wǎng)友
產(chǎn)品精選
搜索問答
還沒有汽配人賬號(hào)?立即注冊(cè)

我要提問

汽配限時(shí)折扣

本頁是網(wǎng)友提供的關(guān)于“超前小導(dǎo)管注漿止?jié){方法有哪些?”的解答,僅供您參考,汽配人網(wǎng)不保證該解答的準(zhǔn)確性。